Chlorination system improvements at the Pequannock Water Treatment Plant

Conversion of gas chlorine system into a onsite production and use of Sodium Hypochlorite system at the Pequannock Water Treatment Plant for drinking water treatment disinfection. Construction started in 2016 and will continue throughout 2017.

Contact information

John T. George, PE (973) 256-4965

$205,437.00

$4,877,000.00

$486,580.00
APPROXIMATELY $4,000,000.00

NJEIT low interest loan #0714001-016

Consultant:

Allied Construction, Inc

Contract:

Contract 06-WS2011