Conversion of gas chlorine system into a onsite production and use of Sodium Hypochlorite system at the Pequannock Water Treatment Plant for drinking water treatment disinfection. Construction started in 2016 and will continue throughout 2017.
John T. George, PE (973) 256-4965
$4,877,000.00
NJEIT low interest loan #0714001-016
Allied Construction, Inc
Contract 06-WS2011