Construction of Netting facility at three separate Combined Sewer Overflow points at Delavan Ave, Fourth Avenue and Roanoke Ave by installing solids/floatables control netting structures to capture, remove and dispose floatables in the combined sewer flow through these CSO points. Construction is expected to continue through summer of 2018.
breana whittaker (973) 256-4965
$4,448,080.00
NJEIT low interest loan #S340815-09
Underground Utilities Corp
Contract 03/05/06-WS2006