The Peddie Ditch CSO solids/floatables control floating structure is in disrepair, and is being replaced with a netting facility. Currently the project is in design (Arcadis US, Inc.) and permitting stage and expected to begin construction in fall 2017 and continue through summer of 2018.
Breana Whittaker, (973) 256-4965
NJEIT low interest loan #S340815-26
Arcadis US, Inc.
Contract 07-WS2016: