Replacement of approximately 10,000 linear feet of 4-inch through 12-inch diameter, old and structurally deteriorated, cast iron water distribution mains city wide, with cement mortar lined ductile iron mains. Project is in permitting phase. Construction to begin in Fall of 2017 and will continue through summer of 2018.
Asadullah Jamali 973-733-5360
Approximately $5,000,000
NJEIT low interest loan #0714001-018
Contract 12-WS2016: