Standby Generator at Wayne Pump Station

Permanent installation of a standby generator at the City’s water pump station located in Wayne Township, under an administrative order from USEPA. This pump station is used to transfer water from the NJDWSC’s Wanaque aqueducts into Newark’s Pequannock Aqueducts, as and when needed. Construction is expected to commence in April 2017 and continue through out 2017.

Contact information

Johnny Lopez 973-256-4965

$205,437.00

$1,859,000.00

$486,580.00
APPROXIMATELY $4,000,000.00

NJEIT low interest loan #0714001-500 (Sandy funding with 19% Principal Forgiveness)

Consultant:

Multi-Phase Electrical Contractors, Inc

Contract:

Contract 06-WS2015